成年网站 I 久久久久中文字幕 I 国产人妻精品午夜福利免费 I 欧美二级片 I 色亭亭 I 手机在线观看毛片 I 日本中文视频 I 午夜av在线免费观看 I 国产8区 I 成人夜视频 I 国产美女一级视频 I 久久午夜影视 I 国产精品第157页 I 亚州av网站 I 久久这里只有精品国产 I 日日夜夜超碰 I k8yy毛片 I 国产91久 I 精品人妻少妇一区二区三区 I av六月天 I 久久国产成人午夜av影院 I 啊v天堂在线观看 I aa成人免费视频 I 精品精品国产高清a毛片 I 老子影院午夜伦不卡 I 免费的国产网站 I 97性无码区免费 I 国产如狼似虎富婆找强壮黑人

關(guān)閉
Solutions

Photovoltaic Zero Carbon Park Solution

#Carbon Free Power Plant ·2022-09-03 08:21:25

Photovoltaic Zero-Carbon Park Solution

Tianchang City Urban Development Group Project Case

Project Overview and Achievements

  • Location: Tianchang City, Anhui Province
  • Installed Capacity: 1.6MW
  • Project Status: Grid-connected and Operational
  • Commissioning Date: June 2023
  • Annual Carbon Reduction: Approx. 1200 tons
  • Annual Average Power Generation: 1.8 million kWh
  • Covered Buildings: 6 factory building roofs

Core Solutions

Photovoltaic Power Generation System

High-efficiency monocrystalline silicon modules, intelligent tracking brackets, distributed rooftop + ground power station combination, maximizing space utilization for clean energy supply

Smart Energy Storage System

Lithium battery energy storage technology, intelligent charge/discharge management, peak shaving/valley filling, emergency backup power, improving energy utilization efficiency by 30%+

Energy Management System

AI energy brain real-time monitoring, big data analysis prediction, intelligent scheduling optimization, achieving energy production-consumption dynamic balance

Multi-energy Complementary System

Integrated wind-solar-storage design combined with ground source heat pumps and biomass energy, building a multi-energy complementary zero-carbon energy network

Green Transportation Support

Solar carports + smart charging piles, park electric transportation system, achieving zero carbon emissions in transportation

Carbon Asset Management

Carbon footprint monitoring, carbon reduction certification, carbon asset development and trading, achieving dual environmental and economic benefits

Implementation Benefit Analysis

85%
Park Clean Energy Coverage
1200 tons
Annual CO? Reduction
30%
Comprehensive Energy Cost Reduction
5-6 years
Investment Payback Period

Start Your Zero-Carbon Park Journey

Based on the successful experience of Tianchang's 1.6MW project, we provide end-to-end photovoltaic zero-carbon park solutions from planning and design to construction and operation

Get Customized Solution

Tags:

Copyright ? 2021-2025 Anhui Tianda New Energy Co., Ltd. All rights reserved  Sitemap ICP:Anhui ICP No. 2022010669-3